m2babaey
Junior Member level 2
- Joined
- Oct 18, 2012
- Messages
- 21
- Helped
- 0
- Reputation
- 0
- Reaction score
- 0
- Trophy points
- 1,281
- Activity points
- 1,445
Hi
Assume I have 2 Switching mode power supplies
For example 2 flyback 400V/12V converters with 5A nominal output current. These power supplies do not have current limit protections
My load (12V) requires a 10A power supply
What happens if I parallel my two SMPSes?
What should I take care about?
I know that in reality, the output voltage of my 2 converters are not exactly equal
I know the concept for paralleling transformers. Current may circulate through transformer windings and there may be problems with load sharing
For switching converters, I guess The converter whose voltage is a bit greater than the other, will supply all the current to load and will get damaged?
What do you think?
What are your suggestions?
Assume I have 2 Switching mode power supplies
For example 2 flyback 400V/12V converters with 5A nominal output current. These power supplies do not have current limit protections
My load (12V) requires a 10A power supply
What happens if I parallel my two SMPSes?
What should I take care about?
I know that in reality, the output voltage of my 2 converters are not exactly equal
I know the concept for paralleling transformers. Current may circulate through transformer windings and there may be problems with load sharing
For switching converters, I guess The converter whose voltage is a bit greater than the other, will supply all the current to load and will get damaged?
What do you think?
What are your suggestions?