leongch
Member level 2
Hello,
I am trying to perform trial by using the DCT (DC topographical) vs the norma DC flow.
I have problem with DCT timing clean but PT has timing violation. I guess it is something related to the RC calculation where the DCT has the DEF information but PT is purely dependent on the wire_load_model.
1. Is the parasitic information write_parasitic can be read in by PT? If not, what should I do in order to make both DCT & PT has same calculation?
I am trying to perform trial by using the DCT (DC topographical) vs the norma DC flow.
I have problem with DCT timing clean but PT has timing violation. I guess it is something related to the RC calculation where the DCT has the DEF information but PT is purely dependent on the wire_load_model.
1. Is the parasitic information write_parasitic can be read in by PT? If not, what should I do in order to make both DCT & PT has same calculation?