Continue to Site

Welcome to EDAboard.com

Welcome to our site! EDAboard.com is an international Electronics Discussion Forum focused on EDA software, circuits, schematics, books, theory, papers, asic, pld, 8051, DSP, Network, RF, Analog Design, PCB, Service Manuals... and a whole lot more! To participate you need to register. Registration is free. Click here to register now.

how to fix timing violations using PT

Status
Not open for further replies.

vishalkatba

Newbie level 6
Joined
Sep 18, 2006
Messages
14
Helped
1
Reputation
2
Reaction score
1
Trophy points
1,283
Activity points
1,399
fix hold site:edaboard.com

how to fix setup and hold violations using pt and without affection eachother means setup should not affect the hold and hold fixing should not affect seup
 

timing violations

PT ,Primetime is Analysis tool(Timing Signoff) not optimized tool. DC/Any synthesis tools are used for fixing the timing violations.

Using PT , we can generate the changes for netlist to minimze the timing violations (like upsize/down size the buffer /insert buffer) and the same script should be used in DC to implement the changes.
 

how to fix the setup violations

yea ture as said above.... PT is for checking violation efficiently but it will nt give any clue for clearing violation n it will nt carry out optimization on nestlist
Shiv
 

how to fix timing vioaltion

I have one more thing in this to add , just check which paths r violating and try upsizing and downsizing , and see the timing reports whether they has been fixed or not , if yes then u can probably replace that buffer in the netlist .
 

how to fix timing

I have one more thing in this to add , just check which paths r violating and try upsizing and downsizing , and see the timing reports whether they has been fixed or not , if yes then u can probably replace that buffer in the netlist .
 

how is buffer useful in fixing hold violations

vishalkatba said:
how to fix setup and hold violations using pt and without affection eachother means setup should not affect the hold and hold fixing should not affect seup

By using, pt reports we can identify the setup and hold violations. You need to use a P&R tool to fix the setup and hold violations. It is not always possible to fix hold violations without affecting the setup violations.
 

Status
Not open for further replies.

Part and Inventory Search

Welcome to EDABoard.com

Sponsor

Back
Top