microe_victor
Junior Member level 2
do the EDA tools change the netlist during floorplan and placement to meet the timing requirement ? or just adjust the position of the cells?
if we adjust the position of the cell, what is changed by doing this except the wire and all timing information related to the wire?
what can we do in Physical Synthesis?
thanks
if we adjust the position of the cell, what is changed by doing this except the wire and all timing information related to the wire?
what can we do in Physical Synthesis?
thanks