electronics20
Full Member level 1
- Joined
- Apr 27, 2011
- Messages
- 99
- Helped
- 2
- Reputation
- 4
- Reaction score
- 2
- Trophy points
- 1,288
- Activity points
- 1,888
Dear scholars and researchers
I dealt with an issue in optimizing a logical gate through finding optimal aspect ratio (for example Flip-Flop) in sub-threshold region. How do I find critical paths in a flip-flop?
Best regards,
I dealt with an issue in optimizing a logical gate through finding optimal aspect ratio (for example Flip-Flop) in sub-threshold region. How do I find critical paths in a flip-flop?
Best regards,