Before floorplan,
1) check if the timing constraints are reasonable, and
2) check the quality of netlist with estimated wire-load.
----------------------------------------------------------------------------------
After floorplan,
--> check the quality of floorplan (the timing of placed netlist with net parasitics.)
-----------------------------------------------------------------------------------