n.suresh60
Junior Member level 3
- Joined
- Sep 15, 2013
- Messages
- 25
- Helped
- 1
- Reputation
- 2
- Reaction score
- 1
- Trophy points
- 1,283
- Location
- Bengaluru
- Activity points
- 1,428
1. from synthesis to gds, what are the must and should checks at each and every steps, like after synthesis, floorplan, powerplan, placement, CTS, routing.?
2). what are the inputs for the above steps?
2). what are the inputs for the above steps?