ldhung
Member level 3
- Joined
- Jul 26, 2004
- Messages
- 64
- Helped
- 0
- Reputation
- 0
- Reaction score
- 0
- Trophy points
- 1,286
- Activity points
- 435
I did timing verification with PrimeTime. After the report_constraint, there are some violations as below
****************************************
report_constraint -all_violators -verbose
Pin: U18129/Y
max_capacitance 0.33
- Capacitance 1.01
------------------------------
Slack -0.69 (VIOLATED)
Pin: U53740/D
max_transition 2.23
- Transition Time 7.51
------------------------------
Slack -5.28 (VIOLATED)
****************************************
But in the report timing file: there are no violations.
****************************************
Report : timing
-path_type full
-delay_type max
-slack_lesser_than 0.00
-max_paths 20
-group CLK
-transition_time
-capacitance
No paths with slack less than 0.00.
****************************************
Anyone help me explain why ? And how to fix the above violation ?
Thank you.
****************************************
report_constraint -all_violators -verbose
Pin: U18129/Y
max_capacitance 0.33
- Capacitance 1.01
------------------------------
Slack -0.69 (VIOLATED)
Pin: U53740/D
max_transition 2.23
- Transition Time 7.51
------------------------------
Slack -5.28 (VIOLATED)
****************************************
But in the report timing file: there are no violations.
****************************************
Report : timing
-path_type full
-delay_type max
-slack_lesser_than 0.00
-max_paths 20
-group CLK
-transition_time
-capacitance
No paths with slack less than 0.00.
****************************************
Anyone help me explain why ? And how to fix the above violation ?
Thank you.