It is said that timing should be checked even on the metal-filled gds since the metal fill can have some effects on the timing of the design. How are these timing checks carried out, in which tool ?
In cadence environment (innovus), you are supposed to import a DEF file with the externally-generated fill shapes into the design. timing analysis takes care of the rest.