chetanbs
Member level 2
Hello,
I am using blast fusion and am facing this problem. there is a memory macro for which i have read the best case and worst case lib files and also the lef file during library preparation. But after floorplan and power ring creation around the macros, the pins of this particular macro are not routed to the power ring/mesh after i run run route power2 pin command.. however pins of all other macros are getting connected. tried connecting the pins using route pin button on the mantle gui but did not work... can anyone suggest what could be wrong with this particular macro?
thanks in advance
chetan
I am using blast fusion and am facing this problem. there is a memory macro for which i have read the best case and worst case lib files and also the lef file during library preparation. But after floorplan and power ring creation around the macros, the pins of this particular macro are not routed to the power ring/mesh after i run run route power2 pin command.. however pins of all other macros are getting connected. tried connecting the pins using route pin button on the mantle gui but did not work... can anyone suggest what could be wrong with this particular macro?
thanks in advance
chetan