owen_li
Full Member level 3
Hi guys.
I have no experience on LVS, but I have a question about LVS run.
In my opinion, the mismatch between layout and schematic can be covered by DRC check. For example, if some pin is connected to some net by mistake, we can see the short by DRC run.
So is there any scenario that LVS can check but DRC not ?
Thanks very much~~~
I have no experience on LVS, but I have a question about LVS run.
In my opinion, the mismatch between layout and schematic can be covered by DRC check. For example, if some pin is connected to some net by mistake, we can see the short by DRC run.
So is there any scenario that LVS can check but DRC not ?
Thanks very much~~~