Re: area cost in xilinx
hi,
i need to calculate the area consumed and power consumption.but these are not directly given in the synthesis report or PR report.
whether routing resources mean the no of slices,FF etc what we get in the synthesis report?
tomasulo,plz eloborate floorplanner editor.
thx.
Added after 5 hours 46 minutes:
hi,
what is the correct procedure for calculating delay.
In the syhthesis report we r getting maximum combinational path delay,whether we can take this value?
thx