strahd_von_zarovich
Advanced Member level 4
Hi everyone,
I have a product which will be tested for EN64000-4-11 standart. One of the guy in test company told me that product's main power supply will be shutdowned for 250ms during operation and expected that product will keep working without any interruption. Power supply in my product is HEP-185-24 from Meanwell and in it's datasheet it says it is compliance to EN64000-4-11. However, it's hold-up time is 16ms at full load. :thinker:
What is the best solution for this problem? My system draws nearly 110W from 220VAC. Using large capacitors after AC/DC power supply is the only solution or is there any alternatives especially small ones.
Thanks in advance.
I have a product which will be tested for EN64000-4-11 standart. One of the guy in test company told me that product's main power supply will be shutdowned for 250ms during operation and expected that product will keep working without any interruption. Power supply in my product is HEP-185-24 from Meanwell and in it's datasheet it says it is compliance to EN64000-4-11. However, it's hold-up time is 16ms at full load. :thinker:
What is the best solution for this problem? My system draws nearly 110W from 220VAC. Using large capacitors after AC/DC power supply is the only solution or is there any alternatives especially small ones.
Thanks in advance.