graphene
Full Member level 2
I created 3 modules namely PGA, ADC, DAC in 3 different folders and simulated and verified them successfully. Each of the three has 4 or 5 other sub-modules..
I now need to create a TOP module that connects to all the 3 modules and also their respective submodules, in this case the name of the folder is Analog_Capture.
When I use a normal port mapping it doesnt work. I think it is because they are in differnt work directory and folders.
Shown are the pictures
The first image is what I get in ISE after connecting the all three top modules but their sub modules are not referenced.
Second image shows my folder structure.
Third image shows sub-modules in one of the modules named PGA.
.
I am not sure if I should use a package or manually add each of the files individually to the project window in ISE. Need help in referencing them. Thank you in advance
I now need to create a TOP module that connects to all the 3 modules and also their respective submodules, in this case the name of the folder is Analog_Capture.
When I use a normal port mapping it doesnt work. I think it is because they are in differnt work directory and folders.
Shown are the pictures
The first image is what I get in ISE after connecting the all three top modules but their sub modules are not referenced.
Second image shows my folder structure.
Third image shows sub-modules in one of the modules named PGA.
.
I am not sure if I should use a package or manually add each of the files individually to the project window in ISE. Need help in referencing them. Thank you in advance