S.Nikhil
Member level 1
Hi,
I am using design compiler to estimate the power of a design. Switching activity is annotated by setting only the static probability value on all primary inputs and leaving design compiler to compute the toggle rate to itself. Is this the right way to estimate pwr of a design.
What is the effect of computing pwr without setting toggle rate and only setting the static probability.
Is it necessary to annotate both the static probability and toggle rate as part of annotating switching activity.
thx
Nikhil
I am using design compiler to estimate the power of a design. Switching activity is annotated by setting only the static probability value on all primary inputs and leaving design compiler to compute the toggle rate to itself. Is this the right way to estimate pwr of a design.
What is the effect of computing pwr without setting toggle rate and only setting the static probability.
Is it necessary to annotate both the static probability and toggle rate as part of annotating switching activity.
thx
Nikhil