Oct 20, 2007 #3 F forkschgrad Full Member level 5 Joined Apr 6, 2007 Messages 271 Helped 18 Reputation 36 Reaction score 9 Trophy points 1,298 Location Philippines Activity points 2,363 if you are doing minor revisions the task can be regarded as revision. if the design would require more time to revise or there are major changes it will be under revision.
if you are doing minor revisions the task can be regarded as revision. if the design would require more time to revise or there are major changes it will be under revision.
Oct 30, 2007 #4 K kender Advanced Member level 4 Joined Jun 19, 2005 Messages 1,425 Helped 138 Reputation 276 Reaction score 39 Trophy points 1,328 Location Stanford, SF Bay Peninsula, California, Earth, Sol Activity points 10,035 Here’s my take on this: Version number reflects the specification. If the specification changes, the version is incremented. Revision number reflects the implementation. If the implementation changes without a spec change (e.g. a bug was fixed), the revision is incremented.
Here’s my take on this: Version number reflects the specification. If the specification changes, the version is incremented. Revision number reflects the implementation. If the implementation changes without a spec change (e.g. a bug was fixed), the revision is incremented.