mrsandy
Newbie level 2
Three triacs have their MT2 terminal connected to the three phases of 220VACV supply. The MT1 terminals are connected together as output. The object is to get supply in the output if there is a failure in any of the phases by firing one of the triacs.
Will there be any problem?
Will there be any problem?