Continue to Site

Welcome to EDAboard.com

Welcome to our site! EDAboard.com is an international Electronics Discussion Forum focused on EDA software, circuits, schematics, books, theory, papers, asic, pld, 8051, DSP, Network, RF, Analog Design, PCB, Service Manuals... and a whole lot more! To participate you need to register. Registration is free. Click here to register now.

Total job time in orcad pspice

Status
Not open for further replies.

kavithanamakkal

Newbie level 4
Newbie level 4
Joined
Sep 28, 2012
Messages
6
Helped
0
Reputation
0
Reaction score
0
Trophy points
1,281
Visit site
Activity points
1,318
After Run in orcad pspice software, output window shows the total job time(using solver1) = 0.03 or some other values. What it means?. how to find the time representations whether in seconds or millseconds or microseconds? what is the difference between total job time and transient response time scale? whether the total job time vary for AC or DC or Transient response analysis or not?
 

HI,
The total job time is how much time it takes to complete your output file, and transient response is, it is the time which can display a particular wave e.g in simulation.
 

the total job time is in seconds or milliseconds ?. because in simulation window it is not showing the time scale.p-lease help me for this also
 

Hi,
You just double click the wave generation properties and enter the values in ms or sec and complete your circuit, place a voltage probe in that particular wave generation part and run simulation. Now in your simulation window you can seethe wave with time period and also keep in mind that the time should be enter in particular window transient response after opening RUN simulation.
 

It is in seconds. It's report total time taken by PSpice in analysis of that circuit.
 

Status
Not open for further replies.

Similar threads

Part and Inventory Search

Welcome to EDABoard.com

Sponsor

Back
Top