atamez
Newbie level 6
Hi,
I am running top level simulations and being challenged by long simulation times. I need to run many sims, but they all have a common programming phase in the beginning
What I would like to do is simulate this common programming phase once and then save the operating points for all the nodes.
Then, for all the other sims I want to use the saved state as the starting point for the sim. This way I can save the long simulation time that the programming phase requires.
Any suggestions? or maybe another forum would be more appropraite?
I am running top level simulations and being challenged by long simulation times. I need to run many sims, but they all have a common programming phase in the beginning
What I would like to do is simulate this common programming phase once and then save the operating points for all the nodes.
Then, for all the other sims I want to use the saved state as the starting point for the sim. This way I can save the long simulation time that the programming phase requires.
Any suggestions? or maybe another forum would be more appropraite?