Hi all,
So I have a combinational ckt(Benchmark c432 ckt to be precise) and I want to find out its critical path using Synopsys Primetime, because it is a combinational circuit it does not have a clock so after reading the design I used the create_clock command in primetime to set up a virtual clock(not sure if it is the right step). After that I am trying to find out the critical path by using the command:
report_timing -from[all_inputs] -to[all_outputs] -max_paths 1
But the report that is getting generated is giving me "no constrained paths".
Can anyone help me with the problem please?
Thanks