Continue to Site

Welcome to EDAboard.com

Welcome to our site! EDAboard.com is an international Electronics Discussion Forum focused on EDA software, circuits, schematics, books, theory, papers, asic, pld, 8051, DSP, Network, RF, Analog Design, PCB, Service Manuals... and a whole lot more! To participate you need to register. Registration is free. Click here to register now.

Placing the test point at top or bottom

Status
Not open for further replies.

Anusuya

Newbie level 3
Joined
Nov 15, 2007
Messages
4
Helped
0
Reputation
0
Reaction score
0
Trophy points
1,281
Activity points
1,310
While placing the testpoint (Through hole & Smd) which one do you prefer
placing the TP in the top or bottom,why ?
 

Test point

Hello, It depends on. Test points usually most helpful to troubleshoot the board by repair technicians. So TPs should be available to them readily. certainly no technician wants to dismantle the device completely to reach a TP. so depending on orientation of board within device place TPs somewhere readily available with minimum effort either top or bottom.
regards,
 

Re: Test point

some production setups use test points on the bottom as they connect with a "bed of nails" production test setup

(this is where there are a bunch of pins (nails) in a contraption and the board is lined up and placed on top. The pins then inject test signals and power into the test points and monitor outputs.)

Clearly if you want to manually prod test points you would want them ontop
 

    Anusuya

    Points: 2
    Helpful Answer Positive Rating
Re: Test point

Hi,

Test point in a circuit board used for specific testing for functional adjustment or quality test in the circuit-based device.


These days most circuit boards are automatically assembled and tested.
Machine test points, for ATE (Automated Test Equipment) bed of nails testing, just need to be pads or lands,this is usually Smd pads,if you ask me about the placement of the smd pad(testing) it again depends on the testing procedures and its requirement.

Let me make one thing clear here,if the boards are prototype then it is usually through hole,because of on-going development in the board.

As i told you earlier if it is for mass production then Smd pad(Test point) is choosen and it depends upon ATE accessibility to the testing point whether to mount it on top or bottom.

Anyways check these sites below it will make you understand about present trend
and procedures...

https://pcdandf.com/cms/content/view/3570/95/

https://www.smtnet.com/library/files/upload/nexlogic.pdf

Hope it helps you...