I faced an issue in LVS using hercules tool.
On Top level I have a block is initialized three times (the same block used three times) which are named MIX1, MIX2I, and MIX2Q.
MIX1 is connected to ground1, MIX2I and MIX2Q are connected to ground2. when I run LVS over FRAM view of the blocks using Black boxing no problems happened, but when I run it on CELL view (layout view) the LVS gave error that ground1 and ground2 are shorted in layout. I don't know why LVS considered the two grounds are shorted if the design is flatten but not if the design is hierarchical.
 


https://www.edaboard.com/threads/99088/ , it might help
 