W_Heisenberg
Full Member level 4
Hi, all
I am doing a layout with cadence now.
I got DRC checking and saw this:
warning: substrate/well soft connected add power/ground label if neccesary
Any genius tells me what does this mean?
BTW, adding label is to add label from LSW? Like the very last third option?
Thanks in advance.
I am doing a layout with cadence now.
I got DRC checking and saw this:
warning: substrate/well soft connected add power/ground label if neccesary
Any genius tells me what does this mean?
BTW, adding label is to add label from LSW? Like the very last third option?
Thanks in advance.