Dec 6, 2007 #1 V vikramc98406 Full Member level 1 Joined Nov 30, 2007 Messages 97 Helped 8 Reputation 16 Reaction score 6 Trophy points 1,288 Activity points 1,939 Due to PVT variations we give Setup(not always) and Hold Margins after CTS. Then run few optimization commands on the design. Does any one heard about AREA OCV and how do we take measure to correct it.
Due to PVT variations we give Setup(not always) and Hold Margins after CTS. Then run few optimization commands on the design. Does any one heard about AREA OCV and how do we take measure to correct it.