pic16f84
Member level 4
i need help in starting plant in my project about <<switch automatic changeover >>
any refrence or beging plant or books or plant
my project talk about cutting electric from the bulding or factory directly there control board using to starting the generater to work and enter instead the electric network andwhen the electric network backing this contol board autmatic cuting the electric from the generater and enter the electric to the bulding from the electric network from comany electric
this control board has name <<<switch automatic change over<<<
and my project to design this board using plc(programmble logic control)
i need starting plant to it
there many board found in site as75kva 100kva 1mva
i need starting plant as plant consist relay and contacter and timer
this circuit reach the current to 2000A ,380v
any refrence or beging plant or books or plant
my project talk about cutting electric from the bulding or factory directly there control board using to starting the generater to work and enter instead the electric network andwhen the electric network backing this contol board autmatic cuting the electric from the generater and enter the electric to the bulding from the electric network from comany electric
this control board has name <<<switch automatic change over<<<
and my project to design this board using plc(programmble logic control)
i need starting plant to it
there many board found in site as75kva 100kva 1mva
i need starting plant as plant consist relay and contacter and timer
this circuit reach the current to 2000A ,380v