leeguoxian
Member level 3
Dear All :
I'm verifying a SoC with a 8051 IP core . And during the top level verification , I'm confused about how to co-verify with hardware and software !
For example, I want to test the gpio function . Then I wrote the test program . But I need to drive the stimulus to my SoC after the test program write the gpio control register. Here comes the question !
How could I know when does the test program write the gpio control register ? How could I synchronize software and hardware ?
thanks
I'm verifying a SoC with a 8051 IP core . And during the top level verification , I'm confused about how to co-verify with hardware and software !
For example, I want to test the gpio function . Then I wrote the test program . But I need to drive the stimulus to my SoC after the test program write the gpio control register. Here comes the question !
How could I know when does the test program write the gpio control register ? How could I synchronize software and hardware ?
thanks