danny davis
Banned
- Joined
- Mar 1, 2013
- Messages
- 627
- Helped
- 0
- Reputation
- 0
- Reaction score
- 0
- Trophy points
- 1,296
- Location
- Hollywood
- Activity points
- 0
Another circuit board at work they use two op amp intergrator circuits in series one after another
The First Op amp intergrator is the RC time delay to reach the input threshold of the #2 second Op amp intergrator
They are in series one after another, 2 stages of intergators
What does having 2 stages of intergators do? a stepper slope?
1.) To measure the input threshold voltage crossing point of the 2nd Op amp intergrator, how would you do this please?
2.) To measure the "TIME to reach" the input threshold of the 2nd op amp intergrator, how would you do this please
The First Op amp intergrator is the RC time delay to reach the input threshold of the #2 second Op amp intergrator
They are in series one after another, 2 stages of intergators
What does having 2 stages of intergators do? a stepper slope?
1.) To measure the input threshold voltage crossing point of the 2nd Op amp intergrator, how would you do this please?
2.) To measure the "TIME to reach" the input threshold of the 2nd op amp intergrator, how would you do this please