Jun 29, 2017 #1 R Reeyam Newbie level 6 Joined Jun 25, 2017 Messages 12 Helped 1 Reputation 2 Reaction score 1 Trophy points 3 Activity points 80 Hi all, What do the terms marked in red mean in the timing report?
Jun 29, 2017 #2 S shaiko Advanced Member level 5 Joined Aug 20, 2011 Messages 2,644 Helped 303 Reputation 608 Reaction score 297 Trophy points 1,363 Activity points 18,302 The "gate delay" is the delay of the logic circuit itself. The "net delay" is the delay of the wire connecting it. https://asic-soc.blogspot.co.il/2008/09/delays-in-asic-design.html
The "gate delay" is the delay of the logic circuit itself. The "net delay" is the delay of the wire connecting it. https://asic-soc.blogspot.co.il/2008/09/delays-in-asic-design.html
Jun 29, 2017 #3 T TrickyDicky Advanced Member level 7 Joined Jun 7, 2010 Messages 7,110 Helped 2,081 Reputation 4,181 Reaction score 2,047 Trophy points 1,393 Activity points 39,769 This wont mean a lot unless the design has failed timing analysis, as the delay should always be lower than the clock speed.
This wont mean a lot unless the design has failed timing analysis, as the delay should always be lower than the clock speed.