Mar 12, 2013 #1 S sakshi gupta Full Member level 1 Joined Jun 30, 2010 Messages 96 Helped 4 Reputation 8 Reaction score 4 Trophy points 1,288 Location India Activity points 1,810 what are the issues in Backend if we use assign statements in netlist ?
Mar 12, 2013 #2 Y YuLongHuang Member level 5 Joined Dec 28, 2010 Messages 84 Helped 16 Reputation 32 Reaction score 16 Trophy points 1,288 Location Taipei, Taiwan Activity points 1,915 As I have heard, this will cause error when apply SPICE for verification. The assign statement means that there are at least two name for the same wire. However, it causes confusion during extraction or comparison. But I don't know whether it's fine for current version for SPICE. As I have known, most back-end tool are able to deal with this issue.
As I have heard, this will cause error when apply SPICE for verification. The assign statement means that there are at least two name for the same wire. However, it causes confusion during extraction or comparison. But I don't know whether it's fine for current version for SPICE. As I have known, most back-end tool are able to deal with this issue.
Mar 12, 2013 #3 S sakthikumaran87 Full Member level 3 Joined Nov 9, 2009 Messages 160 Helped 21 Reputation 42 Reaction score 21 Trophy points 1,298 Location India Activity points 2,176 i dont think there will be any.