Hi,
I see other people using..
* to see the solution .. you won´t find out the ideas behind it
* this does not mean "other people" do the correct thing
35V, perhaps 560-1000 microfarads.
These are not the values needed for your first decisions. --> see post#2
in terms of the type of capacitor, what is the best? You mention ceramic?
* ceramics capacitors provide very low ESR with high frequencies...thus they will have good effect to to reduce HF noise. But you won´t find 35V/100uF ceramics capacitors.
* Low ESR aluminum capacitors provide high capacitance values...but the ESR is way higher than ceramics capacitors.
Each has it´s benefits and drawbacks.
*************
Imagine you have to transport some goods for place A to place B.
What vehicle is best to use?
In your posts above you try to find the solution (aluminum capacitor, ceramics, 10uF ..) without knowing or defining the problem.
* a van (electrolytic capacitor) may be good to transport a ton of apples
* a motorcycle (ceramics capacitor) may be good to transport a letter (faster)
* but if there is water inbetween A and B, then none of the above vehicles is useful.
--> define the problem first, then do the calculations, then find the solution.
***
If you can´t define the problem. (Are you sure there is a problem at all?)
Then the only way is to "trial and error".
Klaus