Aug 29, 2008 #1 S seahs Newbie level 6 Joined Aug 25, 2008 Messages 14 Helped 0 Reputation 0 Reaction score 0 Trophy points 1,281 Activity points 1,362 I am going to charaterize the Vth using the following equation: sqrt(2*I) = (Vgs-Vth)*sqrt(K*W/L)..... and I set up the variable sqrt(2*I) in the ADE. while the following error occured: *Error* Evaluating expression (sqrt((2 * IDC("/M0/D")))). *Error* ("times" 2 t nil ("*Error* times: can't handle (2 * nil)")) Does it mean sqrt(0) is wrong? how to solve it? Thanks.
I am going to charaterize the Vth using the following equation: sqrt(2*I) = (Vgs-Vth)*sqrt(K*W/L)..... and I set up the variable sqrt(2*I) in the ADE. while the following error occured: *Error* Evaluating expression (sqrt((2 * IDC("/M0/D")))). *Error* ("times" 2 t nil ("*Error* times: can't handle (2 * nil)")) Does it mean sqrt(0) is wrong? how to solve it? Thanks.
Aug 29, 2008 #2 P PoojanWagh Junior Member level 2 Joined Aug 27, 2008 Messages 20 Helped 6 Reputation 12 Reaction score 2 Trophy points 1,283 Activity points 1,412 Re: cadence calculator Try posting to comp.cad.cadence: https://groups.google.com.au/group/comp.cad.cadence/topics
Re: cadence calculator Try posting to comp.cad.cadence: https://groups.google.com.au/group/comp.cad.cadence/topics