Continue to Site

Welcome to EDAboard.com

Welcome to our site! EDAboard.com is an international Electronics Discussion Forum focused on EDA software, circuits, schematics, books, theory, papers, asic, pld, 8051, DSP, Network, RF, Analog Design, PCB, Service Manuals... and a whole lot more! To participate you need to register. Registration is free. Click here to register now.

In certain designs, metal 2 is used for power rails instead of metal 1, why ?

Status
Not open for further replies.

Gayathri Jeyaram

Junior Member level 1
Joined
Jul 30, 2012
Messages
16
Helped
4
Reputation
8
Reaction score
4
Trophy points
1,283
Activity points
1,377
I have noticed that power rails are put on metal 2. Metal 1 is not used for signal routing or power routing. Why ?

Is it because at lower technology nodes, there is a lot of signal routing within the std cells so an entire layer (M1) is used up ?
 

Status
Not open for further replies.

Part and Inventory Search

Welcome to EDABoard.com

Sponsor

Back
Top