Feb 24, 2010 #1 E engr Member level 3 Joined Jul 28, 2008 Messages 62 Helped 0 Reputation 0 Reaction score 0 Trophy points 1,286 Activity points 1,701 Hi, why we need to check the timing with PT after place and route, place and route tool can itself checks for timing. whats difference between timing reports of IC Compiler and PT. can explaing details abut the differences
Hi, why we need to check the timing with PT after place and route, place and route tool can itself checks for timing. whats difference between timing reports of IC Compiler and PT. can explaing details abut the differences
Feb 25, 2010 #2 L ljxpjpjljx Advanced Member level 3 Joined May 5, 2008 Messages 968 Helped 80 Reputation 162 Reaction score 56 Trophy points 1,308 Location Shang Hai Activity points 4,679 PT is for timing analysis only and it's very accurate!
Mar 11, 2010 #3 M michealwolf Junior Member level 1 Joined May 5, 2008 Messages 17 Helped 0 Reputation 0 Reaction score 0 Trophy points 1,281 Activity points 1,367 Yes. It's can be for sign-off.