In high-level behavioural synthesis , scheduling is a common term. can anyone tell me if cycle accurate design can be done using cadence software or not ? Or tools which can be used for this purpose. Anybody has some info abt this
Hi niuniu,
thanks .What is MC and BC ? Does that mean scheduling in High-level synthesis was done manually till now and there is no tool ? if not, Do you an Idea how it could be done?
Added after 37 minutes:
My question is how can control and datapath scheduling can be done? Is it imp to do for high-level behavioural synthesis ?