ee1
Full Member level 2
is there a recommended method for reparing violations (timing and drc)?
i mean, should i check before starting any step (placement, cts, routing) that the design is "clean", or i can run the flow, and
after route start fixing them?
i am guessing i should have cleandesign before starting each step...but want to know what you guys think...
thanks!
i mean, should i check before starting any step (placement, cts, routing) that the design is "clean", or i can run the flow, and
after route start fixing them?
i am guessing i should have cleandesign before starting each step...but want to know what you guys think...
thanks!