An information about timing constraints in Design Compiler

Status
Not open for further replies.

always84

Member level 1
Joined
Feb 24, 2010
Messages
39
Helped
0
Reputation
0
Reaction score
0
Trophy points
1,286
Location
italy
Activity points
1,567
I've a design full custom I wanto to synthetize and optmize my design. A part design rules, I can put optimization constraint. How can estimate input delay. I start in a top down synsthesis optimization flow after synthesis how can I estimate optimization constraint like input/ouput delay on timing paths? When do I have to put them ? I've read synopsys manual the explain wath this parameters are but don't explain how to estimate them.
 

Status
Not open for further replies.
Cookies are required to use this site. You must accept them to continue using the site. Learn more…