bayya
Newbie level 5
Hello
I am new to this forum. This is my first post.
I want to use UCC2895 controller for 3KW full bridge phase shift design (90V-150V input & 130V/20A output). It is a battery charger.
Will it be OK?
Any feedback from members regarding the possible problem areas?
I am new to this forum. This is my first post.
I want to use UCC2895 controller for 3KW full bridge phase shift design (90V-150V input & 130V/20A output). It is a battery charger.
Will it be OK?
Any feedback from members regarding the possible problem areas?