rajeshenath
Newbie level 3
- Joined
- Aug 19, 2014
- Messages
- 4
- Helped
- 0
- Reputation
- 0
- Reaction score
- 0
- Trophy points
- 1
- Activity points
- 34
Hello guys...
Firstly I am new to this forum and I am on a vacation of 20 days and would like to make something useful.
I've got a 12V 40ah Lead Acid battery. I placed it into a 650VA UPS (actually I did some google search before doing it). Well..the UPS is working but gives only few minutes backup like 5 or 10 minutes and the ups gets heated(Waited a day long, and got the same result). I again googled and found that the UPS is designed to charge 12v 7ah btys that's why the backup is less and gets heated up.
I managed to get a 12v Transformer-DC output with 4 to 5Amps(checked myself) from an old PMPO.
now my question is:- Is there any way to get these two things combined and get 1 or 2 hour backup??
-Thank you
Firstly I am new to this forum and I am on a vacation of 20 days and would like to make something useful.
I've got a 12V 40ah Lead Acid battery. I placed it into a 650VA UPS (actually I did some google search before doing it). Well..the UPS is working but gives only few minutes backup like 5 or 10 minutes and the ups gets heated(Waited a day long, and got the same result). I again googled and found that the UPS is designed to charge 12v 7ah btys that's why the backup is less and gets heated up.
I managed to get a 12v Transformer-DC output with 4 to 5Amps(checked myself) from an old PMPO.
now my question is:- Is there any way to get these two things combined and get 1 or 2 hour backup??
-Thank you
Last edited: