nervecell_23
Member level 1
I'm new to TimeQuest and have some confusion here:
When I use "set_max/min_delay" command for a particular path in SDC file, is it only used for analyzing the timing eg. simply telling me if that particular path has timing violation based on the specified value, or is the command used to guide the fitting so that the specified value can be met?
If the latter is true, is it possible to constrain a particular clock path/data path ?
Thanks!
When I use "set_max/min_delay" command for a particular path in SDC file, is it only used for analyzing the timing eg. simply telling me if that particular path has timing violation based on the specified value, or is the command used to guide the fitting so that the specified value can be met?
If the latter is true, is it possible to constrain a particular clock path/data path ?
Thanks!