I attach a flow chart of my project.
JOB 1 and JOB 2 are identical processes.
All timers are proposed to be 555/monostable.
JOB 2 will be completed 10 sec after JOB 1.
And then the cycle will be repeated, thus there will be an interval of 10 sec between each job.
Questions:
1) How one timer (Timer A) will trigger the next timer (Timer B)? I mean how will I connect Timer A with Timer B?
2) Studying the flow chart, can somebody guide me if I am correct. And do I need any improvement in the usage of the timers?