swordfisherman
Newbie level 3
I have scan mode both scan shift and scan capture STA pass, and Zero delay gatelevel simulation pass, but the simulation annotated with SDF fails, I use the same SDF check timing ,there is not timing violation, why the scan shift fail? I think STA clean means scan shift should be OK?