eecarefree
Newbie level 2
When doing CTS the following error happend in the gate level optimization step
After the astro successfully completed the clock tree synthesis and doing the build-in optimization, the following message appears in the log file
starting gate level 2 optimization
*****************************************
*Overlap removal(OV) engine terminated
*****************************************
fail to execute command
and the design flow terminated with nothing can do next
Could anyone please help fix this problem? Thank
After the astro successfully completed the clock tree synthesis and doing the build-in optimization, the following message appears in the log file
starting gate level 2 optimization
*****************************************
*Overlap removal(OV) engine terminated
*****************************************
fail to execute command
and the design flow terminated with nothing can do next
Could anyone please help fix this problem? Thank