fmaximovic
Junior Member level 2
Hi all,
suppose that I have a block whose task is adding 1 to its input and output the result after 1 clock delay; also suppose that the behavioral simulation worked just fine.
If the post-PAR (timing simulation) shows a different result, i.e. that the result comes out after 2 clock delays (see the attached figure), what could be the problem?
Thanks guys
suppose that I have a block whose task is adding 1 to its input and output the result after 1 clock delay; also suppose that the behavioral simulation worked just fine.
If the post-PAR (timing simulation) shows a different result, i.e. that the result comes out after 2 clock delays (see the attached figure), what could be the problem?
Thanks guys