engr
Member level 3
Hi,
why we need to check the timing with PT after place and route, place and route tool can itself checks for timing.
whats difference between timing reports of IC Compiler and PT.
can explaing details abut the differences
why we need to check the timing with PT after place and route, place and route tool can itself checks for timing.
whats difference between timing reports of IC Compiler and PT.
can explaing details abut the differences