In the first circuit
If both flops are operating at same clock and the delay of N2 > delay of N1, we should consider the N2 path otherwise N1 path.
In the second circuit
Both +ve and -ve Skews are there. +ve skew will increase the operating frequency and the -ve skew will reduce the maximum operating frequency. So we should take the N2 path for maximum clock frequency calculation.