Sep 9, 2005 #1 Y ymq8328 Member level 3 Joined May 26, 2005 Messages 57 Helped 1 Reputation 2 Reaction score 1 Trophy points 1,288 Activity points 1,847 what these mean in datasheet" Measured at fCLOCK = 25 MSPS and fOUT = 1.0 MHz. 7Measured as unbuffered voltage output with IOUTFS = 20 mA and 50 W RLOAD at IOUTA and IOUTB, fCLOCK = 100 MSPS and fOUT = 40 MHz."
what these mean in datasheet" Measured at fCLOCK = 25 MSPS and fOUT = 1.0 MHz. 7Measured as unbuffered voltage output with IOUTFS = 20 mA and 50 W RLOAD at IOUTA and IOUTB, fCLOCK = 100 MSPS and fOUT = 40 MHz."
Sep 10, 2005 #2 bobcat1 Advanced Member level 4 Joined Jul 10, 2002 Messages 1,284 Helped 99 Reputation 198 Reaction score 34 Trophy points 1,328 Activity points 8,546 Hi In order to operate the device you need to place data on the bus make it study and then supplay the clock All the best Bobi
Hi In order to operate the device you need to place data on the bus make it study and then supplay the clock All the best Bobi