Welcome to our site! EDAboard.com is an international Electronics Discussion Forum focused on EDA software, circuits, schematics, books, theory, papers, asic, pld, 8051, DSP, Network, RF, Analog Design, PCB, Service Manuals... and a whole lot more! To participate you need to register. Registration is free. Click here to register now.

The relation between the Delay slew load arrival time and required time.

Status
Not open for further replies.

sailu

Newbie level 2
Newbie level 2
Joined
May 15, 2007
Messages
2
Helped
0
Reputation
0
Reaction score
0
Trophy points
1,281
Activity points
1,293
hi friends

please tell me the relation between the Delay slew load arrival time required time.

i mean in the column of the timing report, how ti get the arrival time

i have setup time violation, what i have to do to get the positive slack.(how to reduce the arrival time ? ).

please give me the detail explanation.

thanks in advance.
 

Re: timing report

One way to reduce arrival time is to reduce the Combinational logic between start point and end point(on the top of the report you cna find). Another way , to introduce pipeline register. With this you are splitting the combinatonal logic so you get +ve slack.
 

Re: timing report

you can use command "set_critical_range" and "group_path".

Usually, this will lead the tool to optimize the critical path.

David
 

timing report

Added after 18 minutes:

hi what is the relation between the Delay slew load arrival time , required time.
 