Oct 25, 2015 #1 M mepriyasingh Member level 2 Joined Sep 20, 2015 Messages 42 Helped 0 Reputation 0 Reaction score 0 Trophy points 6 Activity points 255 STA: what is the meaning of cost and when we set the cost priority in design?
Oct 25, 2015 #2 D.A.(Tony)Stewart Advanced Member level 7 Joined Sep 26, 2007 Messages 9,576 Helped 1,847 Reputation 3,693 Reaction score 2,340 Trophy points 1,413 Location Richmond Hill, ON, Canada Activity points 61,879 Cost can be measured in clock cycles for buffered texture memory to prevent overflow or cost of STA analysis which can be hours or days depending on constraints with iteration on cell parameters for a complex design. (e.g. ARM)
Cost can be measured in clock cycles for buffered texture memory to prevent overflow or cost of STA analysis which can be hours or days depending on constraints with iteration on cell parameters for a complex design. (e.g. ARM)
Oct 25, 2015 #3 M mepriyasingh Member level 2 Joined Sep 20, 2015 Messages 42 Helped 0 Reputation 0 Reaction score 0 Trophy points 6 Activity points 255 means cost is directly related to run time. or can you give me simple example of cost.