Oct 11, 2013 #1 A Alaa El-Din Mohamed Newbie level 4 Joined Oct 1, 2013 Messages 5 Helped 0 Reputation 0 Reaction score 0 Trophy points 1 Activity points 32 Hi I have just added delays for the gates used in my design e.g. " and #(1,2,3)(c,a,b); " . The question is how can I run the simulation such that it considers the minimum delay of the gates? Thanks in advance
Hi I have just added delays for the gates used in my design e.g. " and #(1,2,3)(c,a,b); " . The question is how can I run the simulation such that it considers the minimum delay of the gates? Thanks in advance