Welcome to our site! EDAboard.com is an international Electronics Discussion Forum focused on EDA software, circuits, schematics, books, theory, papers, asic, pld, 8051, DSP, Network, RF, Analog Design, PCB, Service Manuals... and a whole lot more! To participate you need to register. Registration is free. Click here to register now.

How can I measure time in HSPICE

Status
Not open for further replies.

Jihwan_Park

Newbie level 4
Newbie level 4
Joined
Feb 1, 2021
Messages
7
Helped
0
Reputation
0
Reaction score
0
Trophy points
1
Activity points
60
Can I measure time in HSPICE?

For example,

.model m1 NMOS(LEVEL = 1 VTO = 'TIME')
I want to change parameter VTO if time change in a transient simulation.

Can I do this??
 

Solution
I think you cannot. Even arbitrary sweep of temperature under transient analysis is not so possible.
But, are you sure the MOS parameter should be equivalent with time? Not so realistic, practical.
Maybe you want to sweep VT0 of the MOS in transient analysis, in that case connect a PWL voltage source in series with MOS gate terminal, and sweep the voltage.

frankrose

Advanced Member level 3
Advanced Member level 3
Joined
Nov 27, 2013
Messages
883
Helped
237
Reputation
472
Reaction score
238
Trophy points
1,323
Activity points
7,819
I think you cannot. Even arbitrary sweep of temperature under transient analysis is not so possible.
But, are you sure the MOS parameter should be equivalent with time? Not so realistic, practical.
Maybe you want to sweep VT0 of the MOS in transient analysis, in that case connect a PWL voltage source in series with MOS gate terminal, and sweep the voltage.
 
Solution

dick_freebird

Advanced Member level 7
Advanced Member level 7
Joined
Mar 4, 2008
Messages
8,219
Helped
2,289
Reputation
4,588
Reaction score
2,328
Trophy points
1,393
Location
USA
Activity points
65,726
I would look at simply adding a gate series voltage
source, which will have the same effect as a VT shift.
If you used a controlled or behavioral source then
you could make it time-variant or event-variant.
 